Lorn E. Phillips
Ferndale, MD. 21061
562-343-6840
lornphillips04@gmail.com
· Wireless Construction Project Manager: FTTCS/ETTCS/AAV/OSP/ISP Builds
· AAV/ETTCS Fiber Lead Construction Manager(GC for) Sprint, T-Mobile, AT&T
· ETTCS/ AT&T Ethernet-to-the-Cell- Construction Manager/ Project Spectra
· Construction Drawings Approver, ETTCS/FTTCS, AAV, OSP Planning
· Permitting/ROWs/Easements/Deeds assessor and analyzer, plats & parcels
· Site Acquisition: Zoning, Permitting, Leasing, Phase 1-3
Communication Construction Group, Inc. – Elkridge, MD.
Project Manager – Comcast Account Builds
January 2015- Present
· Manage & Monitor Site Construction Sub- Contractor Activities for Comcast OSP/ISP/AAV/ETTCS
· Design construction SOW’s for fiber backhaul solutions OSP/ISP to cell towers
· Scope & Design construction-based task via Turf 2.0 Contract, create OOMs for PO approval
· Conduct site surveys with (LEC/AAV) to plan Fiber-to-the-cell-site construction plans & SOWs
· Generate estimates for Comcast of the SOWs for ISP/OSP for client approval
· Advise & assist Site Acquisition team on LL issues, permitting ROWs, SOW clarification
· Applying for pole permits BGE and permits through the state of Maryland and counties for lane
closures/underground/aerial.
· Field assessments, monitor progress, mitigate potential issues & reinforce quality standards
· Manage & oversee OSP fiber Installation aerial(lashing) & underground installs for Comcast
· Verify GC’s turnover for accuracy, compile for Comcast & LEC (photos & as-built)
· True-up & reconcile subcontractor invoice according to the SOW performed, change orders
· Evaluate the Sub contractor’s SOW quality work product/restoration/footages
· Perform jobsite safety analysis and inspection.
Tower Resource Management – Hanover, MD.
Civil Crew Lead CM – Sprint & T-Mobile AAV Fiber Project
April 2014 – January 2015
· Manage 4-man crew for Sprint & T-Mobile AAV/Fiber Backhaul installs
· Interpret CDs, managed crew to install PVC/RMC from ISP meet point to carriers’ equip.
· Install carrier’s NIDs (Sprint-Ciena), install its power from BTS, light-test fiber jumpers
· Install galvanized post/I-beam on concrete pad for Ciena, Cadweld post to ground ring
· Provision NID/router (Ciena) & upload scripts to ping to network
· Install Trimm block from the BTS for DC power to the Ciena
· Pull DC & AC power from BTS/Ericsson 3106 cabinet or AC panel to power Ciena NID
· True-up construction sites, footages, material, change orders.
· Punchwalk site/check & verify quality work product, punch items, compile COP
Spectra Services – Roanoke/Richmond, VA.
Field CM/Tech – AT&T (Bechtel-Turf) ETTCS Project
January 2013 – April 2014
· Conduct site surveys/walks with LECs for AT&T ETTCS/fiber backhaul project
· LEC experience Frontier, Century Link, Lumos, Comcast, Verizon, Shentel, PEG Bandwidth
· Design SOWs & Visio drawings with accurate measurements (LEC demarc to AT&T equipment)
· Construct SOWs & layout plan for installing conduit, fiber jumpers, AC/DC wire, breakers
· Dispatch & manage crews’ on-site installs, quality inspections, document change orders
· Install H-frames, Cadweld to ground rings, compression grounding, convertors/fuse panels
· Responsible for full path completion AC/DC wiring per LECs requirements
· AT&T’s NID/router (SIAD mounting/installs), provision & upload scripts for ping to network
· DC power installs for SIAD, CAT5 jumpers to BTS for UMTS on-air migration capability
· Document & true-up SOW details, compile closeout package documentation(photos/asbuilts)
Security, Communications, Engineering, Inc. – Columbia, MD.
Civil Crew Lead CM – AT&T (Bechtel-Turf) ETTCS Project
June 2011 – January 2013
· Manage 4-man crew for Sprint & T-Mobile AAV/Fiber Backhaul installs
· Interpret CDs, managed crew to install PVC/RMC from ISP meet point to carriers’ equip.
· Install carrier’s NIDs (Sprint-Ciena), install its power from BTS, light-test fiber jumpers
· Install galvanized post/I-beam on concrete pad for Ciena, Cadweld post to ground ring
· Provision NID/router (Ciena) & upload scripts to ping to network
· Install Trimm block from the BTS for DC power to the Ciena
· Pull DC & AC power from BTS/Ericsson 3106 cabinet or AC panel to power Ciena NID
· True-up construction sites, footages, material, change orders.
· Punchwalk site/check & verify quality work product, punch items, compile COP
Transport/AAV/ETTCS/FTTCS/Fiber Deployment knowledge
AT&T, Verizon, Sprint, T-Mobile indoor & outdoor equipment, SARC process / Site Acquisition
Leasing, Zoning, Permitting, Easements, Deeds, Titles, Parcels, Ingress, Egress, Property rights,
ROWs, NEPA, SHPO, Compliance, Siterra, FileNet, CASPR, NORAD, AutoCAD, SONET, EPL gear,
Microwave, T1s, DS3s, Cisco SIAD Provisioning, Integration(UMTS Migration) ACAT Scripts,
NodeB, GSM/UMTS, NOC/NFSD outages/cutovers, AT&T Turf 2.0 Contract. Argus, Infinity, Delta
Power Plants, Newmar Power modules, Noran Tel PDPs/PDUs, Canoga Perkins, RAD 204-A
Professional References
Name
Title
Senior Project Manager
Client
Vice President, CFO
Company
Dave Mathauer Construction Supervisor Tower Resource Mgmt.
Kevin Bianchi
Bill Beabout
Hossein Djvadi
Leyla Krikor
Spectra Services
Bechtel
SCE Inc.
Senior Construction Mgr. SCE Inc.
Email
Phone #
dmathauer@trmcom.com 603-661-4722
kbianchi@spectrainc.net
917-716-5234
wbeabout@bechtel.com 240-205-3762
hdjavadi@sceeng.com
lkrikor@sceeng.com
703-966-9888
240-593-2619